Wagamama York was completed in November 2011 after a 15 week programme involving extensive structural works, a complete below-ground drainage system, a new screed throughout and, the installation of a bespoke roof lantern feature. The site was listed and this, combined with the age and construction of the building, created multiple challenges in terms of structural alterations and service routes. Fortunately, the pro-activeness of the project team ensured any such problems were overcome and, to everybody's credit to the project was delivered on programme ensuring that our valued client was open for the Christmas trading period.

Wagamama - York
Wagamama - York
Wagamama - York
Wagamama - York
Wagamama - York
Wagamama - York
Wagamama - York
Wagamama - York
Wagamama - York

This restaurant opened in August 2011 after a 10 week fit-out period. Shopping centres are always a challenging environment to work in given the working restrictions imposed but, having identified and tackled the potential problems at an early stage, we achieved a successful project delivery.

All joinery elements including associated finishes were manufactured in our in house production facility.

Wagamama - Metro Centre (Newcastle)
Wagamama - Metro Centre (Newcastle)
Wagamama - Metro Centre (Newcastle)
Wagamama - Metro Centre (Newcastle)
Wagamama - Metro Centre (Newcastle)
Wagamama - Metro Centre (Newcastle)
Wagamama - Metro Centre (Newcastle)
Wagamama - Metro Centre (Newcastle)
Wagamama - Metro Centre (Newcastle)
Wagamama - Metro Centre (Newcastle)
Wagamama - Metro Centre (Newcastle)

This project consisted of the fit-out of an existing retail premises including structural alterations, new drainage and, a fully opening aluminium shopfront.

We also undertook all of the bespoke manufacture on the project including corian sinks, stencilled artwork, feature chopsticks, waiter stations and, the loose and fixed furniture. Our workshop is equipped with the latest C&C machinery so we are well placed to undertake this type of work

Wagamama - Horsham
Wagamama - Horsham
Wagamama - Horsham
Wagamama - Horsham
Wagamama - Horsham
Wagamama - Horsham

We undertook the extensive renovation of this former bank premises over a 12 week period, handing over to the client in October 2011. The project was particularly challenging given the previous use of the building as a bank and the associated reinforcement of the structure.

A complete new internal drainage system was installed, various structural openings were formed to relocate the internal staircases and, a full screed was laid prior to the internal fit out; all such activities were being fairly restricted due to local noise and traffic restrictions in the city centre. Included in the fit-out phase of the works was a full training/conference set-up for the clients ongoing operational requirements.

Thompsons also undertook the manufacture and installation of all feature joinery elements including the loose and fixed furniture.

Wagamama - Edinburgh
Wagamama - Edinburgh
Wagamama - Edinburgh
Wagamama - Edinburgh
Wagamama - Edinburgh
Wagamama - Edinburgh
Wagamama - Edinburgh
Wagamama - Edinburgh
Wagamama - Edinburgh
Wagamama - Edinburgh

The fit out of the ground and first floor of an existing Tiger Tiger night club in Glasgow city centre. Re-branded to become a Mansion House, the fit out included the Jewel and Merchants Bar on the ground floor and Groovy Wonderland, Kanaloa, The Glasserie and Lucky Voice on the 1st Floor.

The fit out included the entrance to the basement comedy club. Incorporated in the project was LED technology, upholstered bars, illuminated dance floor, glitter paints, mirrored walls and ceilings, hardwood floors, resin floors, upholstered circular seating booths, lucky voice sound proof karaoke booths, tiki themed bar and many more stylish finishes.

All items of manufactured joinery, including the booth seating and lucky voice booths were produced in our workshop. This contract was a rare occasion where Novus Leisure refurbished all their different concepts within one venue at the same time. All five bars, and the works to the Glasserie were completed in 8 weeks, with the ground floor bars being handed back after 7, again another test of our abilities to deliver a high quality finish in a tight programme timescale. The end product was well received by the entire project team.

Mansion House, Glasgow
Mansion House, Glasgow
Mansion House, Glasgow
Mansion House, Glasgow
Mansion House, Glasgow
Mansion House, Glasgow
Mansion House, Glasgow
Mansion House, Glasgow
Mansion House, Glasgow
Mansion House, Glasgow
Mansion House, Glasgow
Mansion House, Glasgow

The fit out of the basement of an existing property in Shoreditch to form a cocktail bar complete with Barrisol ceiling which is illuminated by colour changing LEDs. All items of manufactured joinery, including the bespoke bar with integral seating and, the perimeter booth and banquet seating were produced in our workshop. This contract was another test of our abilities given an extremely tight deadline, the location of site and associated access issues coupled with an complex construction and a wide variety of speciality finishes but, it was completed on time and well received by the entire project team.

Glo Glos, London
Glo Glos, London

The logistics of this site made it a very difficult project indeed; a completely land locked site in Mayfair which is accessed via a narrow alleyway that is shared by a number of neighbouring retail premises. Add to this the fact that we completely transformed this exclusive brasserie in 6 days (which also incorporated a bank holiday weekend!) and you begin to realise the challenge we faced. The Thompson’s team thoroughly enjoyed tackling every obstacle thrown at us however and, we all took a great deal of personal and professional pride in turning this ‘impossible job’ into a resounding success.

Hush, London
Hush, London
Hush, London
Hush, London

This project consisted of the fitting out of the basement and ground floor of a vacant shell including various enabling works such as below ground drainage, structural alterations and steelwork and, a full screed throughout. Our site operations in terms of noise, working hours and service routes were restricted due to the Royal Bank of Scotland’s occupation of the offices above our unit but, these onerous conditions were considerately managed to maintain a good working relationship and the critical path of our project. In spite of these restrictions the fit out of this 1100m2 space was completed within 15 weeks to the satisfaction of the client and their professional representatives.

Vapiano, Bankside
Vapiano, Bankside
Vapiano, Bankside
Vapiano, Bankside

Clifton Road, Blackpool, Lancashire, FY4 4QA  |  Tel: 01253 608470  |  Fax: 01253 608471  |  Login  |  Sitemap

For web services please contact James